Drip edge metal valley flashing dormer chimney and kickout flashing are types of roof flashing that shed water away from the connections between roofs walls chimneys and other building assemblies.
Minimum roof edge details.
Two types of eaves one with a gutter and one with a copper edge strip are shown.
Sika sarnafil minimum requirements detail drawing pdf pdf 190 kb.
Wood nailers must be adequately fas tened to the substrate below to resist uplift loads.
Sheet and fastener layout plan at perimeter edge.
Roof drip edge flashing at roof eaves gable ends.
Detail drawing pdf pdf 137 kb.
In a staggered pattern.
Under the roofing a continuous integral apron is installed and nailed at 3 o c.
Secondary roof drains are to be positioned on the roof so that water will drains to the primary upslope and they should not be installed at the same elevation as the primary.
Struction details illustrated in this manual depict wood nailers and blocking at roof edges and other points of roof termination.
Click to enlarge any image.
This especially is true at parapet walls and copings and roof edges where edge metal shapes are fastened to wood blocking.
Alpine snowguard colorgard detail with décor profile.
Download cad file download cad file.
The eave ends of the standing seam are formed and folded vertically.